Process

Wild Basin

The Kinder Morgan Wild Basin Offload Project was to design a new gas offload facility near Watford City, North Dakota to offload 55 MMSCFD of high-pressure gathered gas from the Watford City gas gathering pipeline to Oasis's Wild Basin Plant. The design of the station included various equipment for liquid handling, separation, truck loadout, and compression. Gas entered the facility at approximately 1,000 psig, heated to approximately 75 F, and pressure reduced to 550 psig.