Nashville Facility Upgrade

The facility upgrade project installed a new 54,000 BBL API 650 tank and additional truck loading bay with a VRU. The existing piping and rack pumps were studied and optimized. The piping was debottlenecked making this truck rack one of the most efficient and best performers in the clients systems. The additive system was upgraded during this project to more modern injector style. Extensive civil work was performed to extend the existing tank dike system to accommodate the new tank. A x' tall retaining all was designed to house the tank and pumps.